A new floodwater pumping station include a wet type storage pool of 7000 m3 adjacent to Ngau Tam Mei Drainage Channel
Supply and Installation of Electrical and Mechanical Equipment at Chuk Yuen Floodwater Pumping Station
New dewatering facilities are added to two existing water treatment works in Tuen Mun and Silvermine Bay respectively.
Construction of Treatment and Disposal Facilities for Waterworks Sludge from Silvermine Bay and Tuen Mun Water Treatement Works
Design, Supply, Installation, Testing & Commissioning for Penstocks & Stoplogs
Tai Po Treatment Works and Pumping Station
An Ultra-violet (UV) irradiation disinfection system at Shek Wu Hui STW was delivered by Trojan Technologies Inc. for the treatment of secondary treated effluent. This particular unit, is by far the HK biggest UV system and first utilizes Medium Pressure High Intensity lamps with self cleaning wipers.
Upgrading of Shek Wu Hui Sewage Treatment Works
A new Sewage Treatment Plant for the development of Ma Wan Island of about 25,000 population.
Ma Wan Development - Sewage Treatment Plant Sub-contract, S&I of Sewage Treatment Equipment and Accessories
Transfer dry weather flow upstream of the inflatable dam for discharging to the Shenzhen River at the downstream
Supply and Installation of Electrical and Mechanical Equipment for San Tin Low Flow Pumping Station
The Shatin STW Stage III Extension is to upgrade and extend the treatment capacity of existing plant in two phases, Phases I and II, and finally to treat 340,000 m3 per day.
Shatin STW Stage III Extension Phase I Works
Modernization of Mechanical and Electrical Equipment in Tuen Mun Fresh Water Pumping Station
Modernization of Mechanical and Electrical Equipment in Tuen Mun Fresh Water Pumping Station
A new Sewage Treatment Plant for the development for Panjin City
Liaoning Province Panjin City WWTP
Design a plumbing and drainage system for Nam Cheong Station in the southern terminus for West Rail.
KCRC - West Rail CC402 - Nam Cheong Station Plumbing and Drainage Installation
The works to be executed under the contract comprise the design and modificiations to upgrade the treatment facilities at the above mentioned Preliminary Treatment Works and Kwai Chung Preliminary Treatment Works
Strategic Sewage Disposal Scheme Stage 1 - Principal Collection and Treatment System - Upgrading of Existing Preliminary Treatment Works
System Design for One Block are :
a. Potable Water System : 25l/s min.
b. Flushing Water System : 12l/s min.
c. Fire Service / Sprinkler Water System : 6l/s min.
Water Supply & Services Term Maintenance Contract ( Sai Kung & Sham Shui Po Region)
System Design for One Block are :
a. Potable Water System : 25l/s min.
b. Flushing Water System : 12l/s min.
c. Fire Service / Sprinkler Water System : 6l/s min.
Water Supply & Services Term Maintenance Contract (Region North 1)
Design, Supply & Installation, Testing & Commissioning of Ham Baker Hartley ‘Coplastix’ Flap Valve
Flood Protection Projects in the Northern Part of the New Territories in HK
The Sewage Treatment Plants under the maintenance of Biwater Man Lee Limited
O & M of STPs in various sites, namely : a. Depots and Stations of MTR b. Seamen’s Training Centre c. Shatin Heights d. Fairview Park e. Sok Kwu Wan Public Toilet f. Yung Shue Wan Public Toilet g. Ma Wan STP
The swimming pools under the maintenance of Biwater Man Lee Limited
O & M of Swimming Pool and Water Feature with Lifeguard Services in various sites, namely : a. Seamen’s Training Centre b. Hampton Place c. Horizon Suite Hotel d. Lynwood Court e.Vista Paradiso f. Various Sites of HKHA
The swimming pool and filtration plant upon completion of works
Design, Supply and Installation of Swimming Pool and Water Feature in various sites, namely : a. Wave Pool at Ocean Park b. Yuen Long Swimming Pool c. Wing On Lodge d. 23 Tai Hong Drive e. English School in Ma On Shan